F-Match Metric

F-Match Metric

posted 05-30-2010 11:26 AM
Hi everybody,
I have a question abaout F-match metric. For my simulation model I have used land use model for 4 time periods. When I checked the results, I was seeing that the F-match metric wasn’t created (the values are 0). I can’t understand what are the problems. I am waiting for your reply.
Regards,
Ercument

Ercument
Geo Newbie

One comment on “F-Match Metric

  1. posted 06-16-2010 01:53 PM
    F match is only computed if there are two and only two land use layers. SLEUTH can only handle two, i.e. it creates a single land use transition matrix from them.
    Keith Clarke

    kclarke
    Geo Member

Leave a Reply